• English
  • Deutsch
  • Español
  • 日本語
  • Français
  • 한국어
Reservations: Arrival: Departure: Promo code MODIFY & CANCEL

Our Videos

Furama Resort Danang is honored to host the 6th Asia Golf Tourism Convention (AGTC) from 7-13 May 2017. AGTC is without a doubt the premier golf travel event in the Asia Pacific region and the highest trending golf destination in Asia at the moment, and will attract a record number of golf tour operators from around the world, along with golf travel suppliers from every golf destination in the Asia Pacific region.

[ read more ]

Make the most of your stay with our rejuvenating treatments that will spoil you thoroughly while taking advantage of our latest deals:

-       Buy 1 Facial Treatment get 20 minute Foot Massage

-       Buy 1 Spa Package get 45 minute Traditional Vietnamese Massage

-       Buy 1 Couple Body Massage get 1 Shampoo Treatment

-       30% discount on Massages, Facials and Body Treatment daily from 8 am to 10 am and from 7 pm to 8 pm.

[ read more ]
500m iron dragon bridge to make Guinness record

Bridge – With the weight of up to 1,000 tons, a dragon-shaped arch bridge crossing the Han River in Da Nang City will be registered for recognition as the World Guinness record and the "largest steel dragon."

Mr. Phan Van Chuong, deputy director of Da Nang Department of Transportation said the department has asked Da Nang authorities for registering a world Guinness record for this work.

world. After the inauguration (scheduled on 29/03/2013, the 38th liberation anniversary of Da Nang,) the bridge will look like a dragon that is breathing fire and water.

By design, the length of the dragon body (concrete and steel dome) is more than 500 meters. The weight of the steel arch is over 1,000 tons. Crossing the dragon body are five steel pipes of 1.2 meter in diameter.

The dragon head and tail are 15m long, 9m high from the beam. The dragon head is in the form of stone dragons of the Ly Dynasty while its tail is designed as stylized lotus symbol.

The Dragon Bridge project was kicked off in July 2009, with a total investment of VND1.5 trillion (over $7 million).

This is the 6th bridge over the Han River, over 666m long, 37.5m wide, with six lanes.

- From Vietnamnet –

Place your ad here? Contact us or call: +848 821 1888